Recently, for one of our clients, we have carried out a comprehensive relocation of silos including connection to the powder feeding system.
Despite the variable and periodically unfavorable weather conditions, the entire operation was a success. Four silos with a length of over 25 m and a diameter of 4.2 m were relocated. The entire operation was completed in two days thanks to preliminary preparation and provision of logistic and executive support.